Thought I would post an update on the basement reno.
This looking into the bathroom with shower base, toilet and plumbing we have one coat of paint up before all the millwork and flooring is in just for efficiency.

This is looking at closet and doorway to bedroom. Bit of a screw up here is the window size does meet code for a bedroom so we have not put a door on the room until after inspection.

This is the laundry room or part of it where the washer and dryer will go and millwork. It's hard to get the whole room in a photo on an iphone.
[img]<http://farm9.staticflickr.com/8431/7844398610_48ef1943ee.jpg[/img]
This looks towards the rec area from the 'office' and laundry room

This is the new mechanical room with brand new electric boiler and all the plumbing- not cheap!

This looks down at the media wall. Waiting for the millwork and the and accent features to go in. All the speaker wire as been run and there is a big 2" conduit pipe to run cables and from consoles to the TV.

Finally this is looking back from the media wall. There is the new electrical panel and there will be millwork and storage buitl in around it but it has to be redesigned as we moved all that from a different wall when we changed the layout during contstruction.

Still waiting on the flooring to arrive and then all the lights to go in and the final electrical tie-ins for dimmers and baseboard heaters as well plus the 'office' window. It's coming but man it's really ground to a halt while you wait for things to arrive.